中文 English
Shandong xiongtai machinery group co., ltd.
  • home
  • About Us
  • Product
  • Video
  • Honor
  • case
  • News
  • Contact
  • Position:Home>COMPANY NEWS

    What are the matters needing attention in the construction of water well drilling rigs

    Release time:2021-1-26    This article is read 774 second

    Small electric well drilling rigs are widely used in home drilling, factory drilling, taking domestic water, installing water air conditioners, solar water heaters, piling on construction sites, etc. This water well drilling rig saves water, does not collapse, and is easy to find water layers.

    The matters needing attention in the construction of water well drilling rig are as follows:

    1 Check whether the down-the-hole impactor, the pipe drilling tool, the casing and the casing shoe are firmly connected before the drilling tool of the water well drilling rig is installed, whether the eccentric drill bit rotates flexibly, and whether the ventilation is smooth.

    2. During the drilling process of the water well drilling rig, attention should be paid to the follow-up situation of the casing and the powder discharge in the hole. When the hole is blown, the upward lifting distance of the drilling tool should be strictly controlled to achieve the limit of excessive blow hole powder discharge. It is forbidden to pull out the drilling tool excessively during the drilling process of the water well drilling rig.

    IMG_20200917_150235.jpg

    3. When the drilling of the water well drilling rig is finished or the drilling tool needs to be replaced, the hole should be cleaned first to blow out the residue at the bottom of the hole, then stop rotating, and slowly lift the drilling tool upwards, the lifting force is just enough to lift the drill If the tool is suitable, the lifting height should be until the back of the eccentric drill bit touches the front end of the casing shoe; then reverse the drill tool at a low speed and try to lift the drill tool slowly upwards. When it is observed that the drilling tool of the water well drilling rig can be lifted smoothly, it indicates that the eccentric bit has been folded. At this time, the drilling tool can be lifted according to the conventional method until all the drilling tools are raised.

    4. Water well drilling rigs sometimes have too much slag at the bottom of the hole, and the rotating part of the eccentric bit is blocked by the slag, which affects the closing of the eccentric bit. When several trials are still not effective, the compressed air should be delivered, the water well drilling rig should be cleaned again, and the down-the-hole hammer should be used for a short time, and then the drilling tool lifting operation should be restarted.

    What are the matters needing attention in the construction of water well drilling rigs
    The last one:Hoisting machine type 50 drilling rigNext item:Hoisting machine type 50 drilling rig

    400-0537-369

    Shandong xiongtai machinery group co. LTD
    National free sales hotline: 400-0537-369
    Seat: 0537-2339569 
    Fax: 0537-2339569
    WeChat: 15905372283
    Email address: xiongtaijx@163.com
    Address: shuyuan industrial park, qufu city, jining city, shandong province

    Mobile Station

    Copyright:Shandong xiongtai machinery group co., ltd. All rights reserved      Lu ICP 19020630 -1   公示信息