中文 English
Shandong xiongtai machinery group co., ltd.
  • home
  • About Us
  • Product
  • Video
  • Honor
  • case
  • News
  • Contact
  • Position:Home>COMPANY NEWS

    What are the preparations before using the full hydraulic drilling rig?

    Release time:2021-5-20    This article is read 909 second

    Shandong Xiongtai Group specializes in the production of full hydraulic drilling rigs, hydraulic core drilling rigs, soil sampling drilling rigs, etc.

    The preparation work before using the full hydraulic drilling rig is as follows:

    1) Check whether the connection of each oil pipe is reliable;

    微信图片_20210506160934.jpg

    2) Check whether the installation of the column is firm and reliable;

    微信图片_20210506160946.jpg

    3) Check whether the hydraulic oil in the oil tank is added to the specified position and whether the filter is blocked. When the new machine is started, when the pump station is working, the hydraulic components are filled with oil to reduce the oil level, and then the oil should be filled in the oil tank

    What are the preparations before using the full hydraulic drilling rig?
    The last one:Hoisting machine type 50 drilling rigNext item:Hoisting machine type 50 drilling rig

    400-0537-369

    Shandong xiongtai machinery group co. LTD
    National free sales hotline: 400-0537-369
    Seat: 0537-2339569 
    Fax: 0537-2339569
    WeChat: 15905372283
    Email address: xiongtaijx@163.com
    Address: shuyuan industrial park, qufu city, jining city, shandong province

    Mobile Station

    Copyright:Shandong xiongtai machinery group co., ltd. All rights reserved      Lu ICP 19020630 -1   公示信息