中文 English
Shandong xiongtai machinery group co., ltd.
  • home
  • About Us
  • Product
  • Video
  • Honor
  • case
  • News
  • Contact
  • Position:Home>COMPANY NEWS

    What are the precautions for the use of the water well drilling rig during the running-in period?

    Release time:2020-11-16    This article is read 857 second

    Water well drilling rigs are widely used in home drilling, factory drilling, taking domestic water, farmland irrigation wells, installing water air conditioners, solar water heaters, piling on construction sites, etc.

    The precautions for use during the running-in period of the water well drilling rig are as follows:

        1. The operator should accept the training and guidance of the manufacturer, have a full understanding of the structure and performance of the drilling rig, and obtain certain operation and maintenance experience before operating the machine. The product operation and maintenance manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the operation and maintenance manual and operate and maintain according to the requirements of the manual.

        2. Pay attention to the working load during the running-in period. Generally, the working load during the running-in period should not exceed 80% of the rated working load, and proper workload should be arranged to prevent overheating caused by the machine's long-term continuous operation.

        3. Pay attention to frequently observe the instructions of each instrument. If there is an abnormality, stop and remove it in time. Do not work until the cause is not found and the fault is not removed.

    水井钻机.jpg

        4. Pay attention to frequently check the lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) level and quality, and pay attention to check the sealing of the whole machine. Excessive oil and water are found during the inspection, and the cause should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended to add grease to the lubrication point during the running-in period (except for special requirements).

        5. Keep the machine clean, adjust and tighten loose parts in time to prevent the loose parts from aggravating the wear of the parts or causing the parts to be lost.

        6. At the end of the running-in period, compulsory maintenance of the machine should be carried out, inspection and adjustment should be done, and attention should be paid to the replacement of oil.

        In summary, the precautions for the use of water well drilling rigs during the running-in period can be summarized as: load reduction, attention to inspection, and enhanced lubrication. As long as you pay attention to and implement the maintenance and maintenance of the construction machinery during the running-in period as required, it will reduce the occurrence of early failures, prolong the service life, improve operating efficiency, and bring you more economic benefits.

    What are the precautions for the use of the water well drilling rig during the running-in period?
    The last one:Hoisting machine type 50 drilling rigNext item:Hoisting machine type 50 drilling rig

    400-0537-369

    Shandong xiongtai machinery group co. LTD
    National free sales hotline: 400-0537-369
    Seat: 0537-2339569 
    Fax: 0537-2339569
    WeChat: 15905372283
    Email address: xiongtaijx@163.com
    Address: shuyuan industrial park, qufu city, jining city, shandong province

    Mobile Station

    Copyright:Shandong xiongtai machinery group co., ltd. All rights reserved      Lu ICP 19020630 -1   公示信息