中文 English
Shandong xiongtai machinery group co., ltd.
  • home
  • About Us
  • Product
  • Video
  • Honor
  • case
  • News
  • Contact
  • Position:Home>产品知识

    产品知识

    The company has professional and technical personnel, R&D engineers and after-sales service personnel to form an experienced team.

    Structural Features of Core Drilling Rig

    Structural Features of Core Drilling Rig

    This drill rig adopts mechanical transmission, featuring a simple structure for easy maintenance and operation.
    It is equipped with a water‑brake device, which can control the tripping‑in speed, reduce wear of components such as drum and brake band, eliminate impact force of the hoisting system and ensure safe tripping.
    Technical improvements have been made on the original rig design.

    2019-5-28
    Structural Features of Core Drilling Rig

    Structural Features of Core Drilling Rig

    The drilling rig features a compact and simple structure.
    All its components, including drill rods, can be transported by one 5‑ton truck.
    In areas with poor traffic access, parts can be carried by manpower or pack horses along narrow trails.
    It greatly saves customers’ investment in building temporary access roads and shortens the exploration construction period.

    2019-5-28
    Mechanical Composition of Water‑Well Drilling Rig

    Mechanical Composition of Water‑Well Drilling Rig

    Hydraulic Oil Pump: It is a double pump.
    The large‑displacement pump supplies power for the power head,
    while the small‑displacement pump drives four outrigger cylinders, mast lifting cylinder and the pull‑down/hoist trolley cylinder.
    Four Outriggers: The small water‑well drilling unit’s outriggers consist of hydraulic cylinders and fixing frames.

    2019-5-28
    Heating and Cooling System of Engineering Drilling Rig

    Heating and Cooling System of Engineering Drilling Rig

    When the power supply of the main‑motor heater for the top‑drive unit is normal and the main motor is not running, the heater can be started or stopped via the [Motor Heating] switch on the door of the PLC/MCC cabinet. The operating status is indicated by the heater indicator light on the PLC/MCC cabinet. While the PLC system is in normal condition

    2019-5-28
      总计1页 [ 1 ]上一页 下一页

    400-0537-369

    Shandong xiongtai machinery group co. LTD
    National free sales hotline: 400-0537-369
    Seat: 0537-2339569 
    Fax: 0537-2339569
    WeChat: 15905372283
    Email address: xiongtaijx@163.com
    Address: shuyuan industrial park, qufu city, jining city, shandong province

    Mobile Station

    Copyright:Shandong xiongtai machinery group co., ltd. All rights reserved      Lu ICP 19020630 -1   公示信息